What we do, in detail

Four trades, with the demolition regime settled before any price.

Program 01 · Code 43.110

Demolition and strip-out

A demolition is priced by what leaves the site, not by what gets knocked down. Rubble carrying proper traceability is accepted as low-risk material and becomes certified aggregate; the identical rubble without it is high-risk waste at a different price, or is turned away. Since the follow-up plan has to exist before a permit application, this is the part of a project that cannot be fixed later, and it is settled before we quote rather than after.

  • Per project
  • Private and commercial
  • Regime established first
  • No firm date warranted

Start this program

Step 1 · Threshold

Above or below, established in writing.

Step 2 · Inventory

Asbestos identified before anything starts.

Step 3 · Selective

Streams separated in the right order.

Step 4 · Certificate

Obtained, so the rubble is accepted.

Step 1 · Drawings

Read properly, with questions asked early.

Step 2 · Programme

Realistic, with the dependencies named.

Step 3 · Build

With changes recorded as they arise.

Step 4 · Handover

Snags listed, not quietly left.

Program 02 · Code 41.001

Residential construction

On a project needing a permit, the architect's involvement is required by law and the architect supervises the execution, which is why that role cannot sit with us. We would rather say so first than be asked for an all-in package that nobody may lawfully supply. What we do is build what has been designed, raise the problems the drawings did not anticipate, and put the answers in writing before carrying on.

  • Per project
  • Private clients
  • Architect stays independent
  • Decennial insurance

Start this program

Program 03 · Code 43.910

Masonry and structure

Opening up an existing wall is the point at which a renovation discovers what it actually is. Lintels that were never there, a chimney doing structural work nobody expected, a wall that turns out to carry something. We price the opening up separately from the work that follows, because a fixed price covering unseen structure is either padded or about to become a dispute.

  • Per project
  • Renovation and new build
  • Opening up priced apart
  • Changes recorded

Start this program

Step 1 · Open up

Priced on its own, before the rest.

Step 2 · Assess

What is really carrying what.

Step 3 · Agree

The work, and the revised price.

Step 4 · Build

Supported, then made good.

Step 1 · Route

Where pipes will run, agreed.

Step 2 · Install

To the undertaker's requirements.

Step 3 · Photograph

Before anything closes over it.

Step 4 · Test

Pressure and drainage, before finishing.

Program 04 · Code 43.221

Sanitary work

Most of this work is invisible and most of its failures are expensive, which is a poor combination. Two things therefore get attention beyond their apparent importance: protecting the public supply against backflow, which exists for everyone else's benefit rather than yours, and recording where pipes actually run before a wall closes over them. A photograph of an open wall is worth a great deal ten years later.

  • Per project
  • Renovation work
  • Routes photographed
  • Undertaker's requirements

Start this program

Something to come down, or something to build?

A free first site visit, with no obligation. On a demolition we will establish which rubble regime applies before quoting.