Free first site visit
What the project really involves, including whether it is worth doing as intended.
Traced demolition produces low-risk material a crusher turns into certified aggregate. Untraced, the identical concrete is high-risk waste, handled separately and priced accordingly. The plan comes before the permit.
Building, demolition, masonry and sanitary work. On a demolition, which regime the rubble falls under gets established before a price is given.
Full or partial demolition, traced through the follow-up scheme so the rubble keeps its value.
See the programBuilding and rebuilding homes, with an architect who stays independent of the contractor.
See the programBrickwork, blockwork, openings and the structural alterations an old building keeps hiding.
See the programSupply and waste pipework in a renovation, connected in a way the water undertaker accepts.
See the programOn a demolition the applicable regime and the asbestos position are established before a price is given, opening-up work is priced separately from what follows, and changes are recorded as they arise rather than argued about at the end.
What the project really involves, including whether it is worth doing as intended.
Thresholds, follow-up plan and asbestos inventory, settled before quoting.
Opening up separated from the work it reveals, so neither is guesswork.
Changes written down, pipe routes photographed, snags listed openly.
Quoted per project after a site visit. Opening-up work is quoted separately, and no advance payment is requested through this site.
Traced, so the rubble keeps its value.
Built to drawings, with changes recorded.
Said plainly, because it protects you too.
Every engagement is quoted after a free consultation. No subscription.
TE-PA is a company incorporated under Belgian law, registered with the Crossroads Bank for Enterprises under enterprise number 0689.779.569, based at Neckerspoelstraat in Tielt-Winge in Flemish Brabant, and trading since February 2018. Pawel Kozakiewicz has led it throughout, as manager from 2018 and as director since August 2022, when the company changed its legal form and objects. Its registered activities are general construction of residential buildings, demolition, masonry, sanitary work and other specialised construction work.
The subject on the front page gets there because it is the part of a demolition budget a client has no way of guessing. In Flanders, rubble that has been traced through a recognised demolition follow-up scheme, and carries the certificate to prove it, is accepted by a processor as low environmental risk material and can become certified recycled aggregate. Identical rubble with nothing behind it is high environmental risk: processed separately, charged at a different rate, and sometimes refused. The plan that makes the difference has to exist before the permit application, so it is not something that can be added once a wall is down. Above the volume thresholds set by the regulations it is compulsory in any case. Below them it still usually pays for itself, and that calculation belongs in a quotation rather than in a surprise.
Because what a processor may do with it depends on what is known about it. Rubble arriving from a demolition that was traced through a recognised follow-up scheme, with the corresponding certificate, is accepted as having a low environmental risk profile, and that allows the crusher to produce certified recycled granulates from it. Rubble with no such traceability has to be treated as high risk: handled separately, processed differently, charged at a materially higher rate, and in some cases simply turned away. The difference is not in the concrete. It is in whether anyone can show what was in the building before it came down.
Above the volume thresholds laid down by the regulations, which differ between non-residential and residential buildings. The clearest of them is a thousand cubic metres for non-residential buildings; residential buildings have their own, higher threshold, and rather than quote a figure we would have to qualify, we establish the position for your specific project in writing before quoting. The timing matters more than the number: the plan has to exist before the permit application. A demolition that begins without one cannot acquire it retrospectively, and the rubble is then stuck in the expensive category.
No, and conflating the two causes real problems. The certificate connected with selling a building constructed before 2001 is an obligation of the seller in a transaction. What applies here is different: before works are undertaken, an asbestos inventory of the workplace is required under the legislation on the welfare of workers, and it exists to protect the people doing the work. A seller's certificate does not discharge it, and having had one does not mean an inventory is unnecessary. Where asbestos is found and its removal is reserved to a recognised undertaking, we stop and a recognised undertaking does that part.
No, and nobody may. For works requiring a permit the involvement of an architect is required by law, and the architect's statutory mission includes supervising the execution of the works — which is precisely why the profession is legally incompatible with that of contractor. An architect cannot supervise a job they are also building. If a contractor offers you an all-in package with the architect included, that is the question to put to them. We build to the architect's drawings and the architect stays independent of us.
Because a price covering what nobody has seen is either inflated to cover the worst case or heading for an argument. In an older building, opening a wall regularly reveals a missing lintel, a chimney doing unexpected structural work, or a partition that turns out to be carrying a floor. We quote the opening up on its own, look, and then agree the work and the price for what is actually there. It is less comfortable at the quotation stage and considerably less expensive by the end.
Only in writing, and only where it is genuinely within our control. Dates on building work depend on permits, on inspections carried out by third parties, on weather, and on other trades being where they said they would be. A contractor who promises a firm date across all of that is making a promise about other people's behaviour. We will give an honest estimate, tell you what it depends on, and tell you promptly when something moves rather than at the end.
A free first site visit, with no obligation. On a demolition we will establish which rubble regime applies before quoting.